Identify the relevant CCTV, structured cabling or other ELV components mentioned in the project requirements.
Low Current Systems
Low-current systems for connected, communicative building environments.

What this service involves.
Harwal’s low-current / ELV services include CCTV, structured cabling and associated extra-low-voltage systems. Installation planning considers routes, communication infrastructure and interface coordination with other building services.
HARWAL / COMPANY-PROVIDED PROJECT IMAGERYAreas included in the scope
CCTV infrastructure
Structured cabling
ELV system routing and interfaces
Coordination with building services
Designed around the project brief.
Low-current networks rely on the right pathways and coordination with the electrical and architectural work. The information gathered at the start shapes cable routes, device positioning and the layout of associated cabinets or termination locations.
Review cable routes, containment, access points and coordination with interior finishes.
Clarify interfaces with power, communications and any existing building systems.
Useful details to prepare.
These are questions to help define an enquiry, not a fixed product specification or service guarantee. HARWAL can review the applicable scope when you contact the team.
Discuss Low Current SystemsWhich low-current systems are included in your brief?+
Share this detail with the Harwal team when requesting a project-specific scope. Requirements can be discussed using the available brief, drawings and site information.
Are device locations, schedules and cabling requirements defined?+
Share this detail with the Harwal team when requesting a project-specific scope. Requirements can be discussed using the available brief, drawings and site information.
Does the work interface with an existing network or building installation?+
Share this detail with the Harwal team when requesting a project-specific scope. Requirements can be discussed using the available brief, drawings and site information.
Connected systems need a connected brief
Low-current work sits within the wider building-services environment. Start by describing the communication and connectivity requirements of the space, the intended device locations and the information already available in the project documents.
Routes and equipment positions can share ceiling voids, risers and service zones with other disciplines. Identifying these interfaces early helps frame a more useful discussion about layout, space and coordination.
Mention existing infrastructure, the areas to be connected and any equipment schedules. The exact system selection and applicable scope should be reviewed against the project requirements.
Discuss your requirements


